We worked on the place again and made good progress. The floor needed another layer of OSB to really suit my tastes so we got that installed and screwed down first thing. Oh wait, the first thing we did was finish getting the second sheet of OSB hung around the outside walls. Then we did the floor. We laid down the last piece of flooring and check out how well it fit! I am so thankful that everything is square:
We also persuaded Isaac to involve himself with the building of this place. He did a great job screwing down 2 sheets of flooring. My brother bought me a new Makita impact driver which is AWESOME! It is so fast and light.
Anyhow, Isaac was running that and got a bit of the Dirty Harry feel going for him. I guess he was feeling like he needed to pick on Abigail some though as he split after sheet #2 was installed. Still, it was a great thing seeing the boy work!
The inspector checking on things…
So, after we got the outer walls done and the flooring down, we started on the inner walls. On Sunday, we were able to get the interior walls for the bathroom and kitchen built. We also hung about 1/3 of the sleeping loft’s floor joists. We should be able to finish that pretty quickly which will make all of the high-up work like the last of the outer walls’ OSB and the roof rafters go up pretty easily. The only thing that I though I was going to like but don’t is the 8 foot ceilings in the bathroom and kitchen (and eventually, everywhere else).

We installed 8 foot boards beside the 10 foot wall studs to support the sleeping loft floor. That leaves us with just under 2 extra feet for a knee wall in the sleeping area
It’s too high and we lose some of the advantage of the added height of the exterior walls. I am not redoing it now though so we are going to have really nice high rooms in our deluxe shed, or, as I have been calling it, the city-slickers’ deer stand!